{"id":1037,"date":"2026-03-02T19:39:25","date_gmt":"2026-03-02T19:39:25","guid":{"rendered":"https:\/\/greenelectricsolutions.com.au\/blog\/?p=1037"},"modified":"2026-03-22T21:18:01","modified_gmt":"2026-03-22T21:18:01","slug":"7-99kw-solar-44-8kwh-battery-installation-in-clyde-vic-3978","status":"publish","type":"post","link":"https:\/\/greenelectricsolutions.com.au\/blog\/7-99kw-solar-44-8kwh-battery-installation-in-clyde-vic-3978\/","title":{"rendered":"7.99kW Solar &amp; 44.8kWh Battery Installation in Clyde Melbourne VIC 3978"},"content":{"rendered":"\n<p>Homeowners in <strong>Clyde VIC 3978<\/strong> are moving fast to secure high government rebates <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/victorian-battery-rebate-2026\/\">before they reduce after April<\/a>. This recently completed <strong>7.99kW solar and 44.8kWh battery installation in Clyde VIC<\/strong> for our client <strong>Jaspreet<\/strong> demonstrates how combining premium solar panels with large-capacity battery storage can dramatically cut power bills and future-proof your home.<\/p>\n\n\n\n<p>With rising electricity prices across Melbourne Victoria, this system delivers long-term savings, blackout protection, and maximum rebate benefits.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Unlock Maximum Solar Rebates<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">System Overview \u2013 Designed for Performance &amp; Reliability<\/h2>\n\n\n\n<p>This installation was delivered by <strong>Green Electric Solutions<\/strong>, with expert installer <strong>Habib<\/strong> leading the project to ensure full compliance and clean workmanship.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Solar System Details:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>17 \u00d7 Jinko Solar JKM470N-48HL4M-DV panels<\/strong><\/li>\n\n\n\n<li><strong>Total System Size:<\/strong> 7.99kW<\/li>\n\n\n\n<li><strong>Technology Standard:<\/strong> IEC 61215-2021 certified<\/li>\n\n\n\n<li><strong>Estimated Annual Production:<\/strong> 9,974 kWh<\/li>\n\n\n\n<li><strong>Estimated Annual Savings:<\/strong> $1,208.29<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Battery Storage System:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>2 \u00d7 GoodWe LX F22.4-H-20 batteries<\/strong><\/li>\n\n\n\n<li><strong>Total Usable Capacity:<\/strong> 44.8kWh<\/li>\n\n\n\n<li><strong>Battery Technology:<\/strong> Lithium Iron Phosphate (LFP)<\/li>\n\n\n\n<li><strong>Inverter:<\/strong> GoodWe GW9900-ET-20 (AS4777-2 2020) \u2013 ET G2 Series<\/li>\n<\/ul>\n\n\n\n<p>This <strong>7.99kW solar and 44.8kWh battery installation in Clyde VIC<\/strong> ensures high solar generation during the day and powerful storage capacity for evening and peak-hour usage.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"420\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/All-1024x420.png\" alt=\"7.99kW Solar &amp; 44.8kWh Battery Installation in Clyde Melbourne VIC 3978\" class=\"wp-image-1040\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/All-1024x420.png 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/All-300x123.png 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/All-768x315.png 768w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/All.png 1255w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Book Your Home Assessment Now<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Massive Government Rebates \u2013 $18,460 in Total Support<\/h2>\n\n\n\n<p>One of the strongest drivers behind this installation was the exceptional rebate support currently available in Victoria.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Government Incentives Applied:<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>46 STCs:<\/strong> \u2212$1,748.00<\/li>\n\n\n\n<li><strong>376 Battery STCs:<\/strong> \u2212$13,912.00<\/li>\n\n\n\n<li><strong>Solar VIC PV Rebate:<\/strong> \u2212$1,400.00<\/li>\n\n\n\n<li><strong>Solar VIC Interest-Free Loan:<\/strong> \u2212$1,400.00<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Total Government Rebates: <strong>$18,460.00<\/strong><\/h3>\n\n\n\n<pre class=\"wp-block-preformatted has-background\" style=\"background-color:#eda321\"><strong>Important Notice:<\/strong> Government rebates are currently at their highest levels but are expected to reduce after April. Delaying your installation could mean losing thousands in savings. We just introduced a <a href=\"https:\/\/greenelectricsolutions.com.au\/victoria-battery-rebate-calculator-for-2026\/\">rebate calculator<\/a> for you - see how much you could save?<\/pre>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Secure Today\u2019s High Rebates Before April<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why This System Is Ideal for Clyde Melbourne Homes?<\/h2>\n\n\n\n<p>Clyde homeowners typically experience high afternoon and evening energy demand. With nearly <strong>10,000 kWh annual solar production<\/strong> and <strong>44.8kWh battery capacity<\/strong>, this system offers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reduced grid reliance<\/li>\n\n\n\n<li>Protection against rising tariffs<\/li>\n\n\n\n<li>Backup capability during outages<\/li>\n\n\n\n<li>Better solar self-consumption<\/li>\n\n\n\n<li>Future EV charger readiness<\/li>\n<\/ul>\n\n\n\n<p>For growing families and high-usage households, a <strong>7.99kW solar and 44.8kWh battery installation in Clyde VIC<\/strong> delivers genuine energy independence.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Go Solar Go Energy Independent<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why Homeowners Choose Green Electric Solutions?<\/h2>\n\n\n\n<p>Choosing the right installer matters just as much as choosing the right equipment. Green Electric Solutions maintains the highest safety, compliance, and workmanship standards across Victoria \u2014 ensuring every system is built for long-term performance, savings, and reliability.<\/p>\n\n\n\n<p>We don\u2019t just install solar and battery systems \u2014 we deliver complete, end-to-end energy solutions designed for Victorian homes.<\/p>\n\n\n\n<p>\u2714 NET Approved &amp; Solar Victoria Approved<br>\u2714 SAA-Certified Solar Electricians<br>\u2714 Thousands of successful installations across Victoria<br>\u2714 Premium solar panels, inverters &amp; battery systems<br>\u2714 Full rebate &amp; STC paperwork handled end-to-end<br>\u2714 Clean, compliant &amp; professional installations<br>\u2714 Strong local after-sales support you can rely on<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">More Than Installation \u2014 A Complete Walkthrough &amp; Ongoing Support<\/h3>\n\n\n\n<p>Many companies install and leave. We don\u2019t.<\/p>\n\n\n\n<p>With Green Electric Solutions, you receive a <strong>complete system handover and education session<\/strong>, including:<\/p>\n\n\n\n<p>\u2714 Step-by-step help installing your solar\/battery monitoring app<br>\u2714 Full <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/17-39kw-solar-48-36kwh-battery-installation-in-panton-hill-melbourne-vic-3759\/#walkthrough\">walkthrough<\/a> of how your inverter &amp; battery system works<br>\u2714 Explanation of production graphs, usage stats &amp; savings tracking<br>\u2714 Guidance on maximizing self-consumption<br>\u2714 Battery charge\/discharge strategy explained clearly<br>\u2714 Tips to reduce peak grid usage and lower bills<\/p>\n\n\n\n<p>We make sure you <strong>fully understand your system<\/strong>, so you can confidently monitor performance and maximise your return on investment.<\/p>\n\n\n\n<p>We service Clyde VIC 3978 and all suburbs within <strong>80km of Altona<\/strong>, ensuring fast site visits and responsive support.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"408\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/S-1024x408.png\" alt=\"7.99kW Solar &amp; 44.8kWh Battery Installation in Clyde VIC 3978\" class=\"wp-image-1042\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/S-1024x408.png 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/S-300x120.png 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/S-768x306.png 768w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/03\/S.png 1363w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Confirm Service Availability in Your Suburb<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">We Are Your Local Solar &amp; Battery Installer in Melbourne <\/h2>\n\n\n\n<p>Unlike interstate retailers or commission-based solar\/battery companies, we operate as a <strong>genuine local installation team<\/strong> (Altona based). That means:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Direct access to qualified installers<\/li>\n\n\n\n<li>No subcontracted crews<\/li>\n\n\n\n<li>Faster on-site inspections<\/li>\n\n\n\n<li>Better understanding of Victorian grid compliance<\/li>\n\n\n\n<li>Long-term after-sales accountability<\/li>\n<\/ul>\n\n\n\n<p>From initial consultation through to commissioning and ongoing support, you\u2019re dealing with a <strong>locally accountable <a href=\"https:\/\/greenelectricsolutions.com.au\/\">Green Electric Solutions<\/a> team that stands behind its work<\/strong>.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Book Your Local Site Assessment Today<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">How much can I save with a 7.99kW solar system in Clyde?<\/h3>\n\n\n\n<p>Approximately <strong>$1,200+ annually<\/strong>, depending on usage patterns and tariff structure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is a 44.8kWh battery too large for a home?<\/h3>\n\n\n\n<p>Not for high-usage households. Larger battery systems maximise rebate value and reduce peak-hour grid reliance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Are rebates guaranteed?<\/h3>\n\n\n\n<p>Rebates are subject to eligibility and government allocation limits. Acting before April secures higher incentive levels.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"contact\">Is Now the Right Time?<\/h2>\n\n\n\n<p>If you&#8217;re in <strong>Clyde VIC 3978<\/strong>, installing a <strong>7.99kW solar and 44.8kWh battery system<\/strong> before April could be one of the smartest financial decisions this year. With $18,460 in government support applied to this project, the opportunity window is significant\u2014but limited.<\/p>\n\n\n\n<p>Green Electric Solutions combines certified expertise, premium products, and full rebate handling to make the transition seamless.<\/p>\n\n\n<div class='fluentform ff-default fluentform_wrapper_2  ff_guten_block ff_guten_block-2 ffs_default_wrap'><form data-form_id=\"2\" id=\"fluentform_2\" class=\"frm-fluent-form fluent_form_2 ff-el-form-top ff_form_instance_2_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_2_1\" method=\"POST\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">blog lead<\/legend><input type='hidden' name='__fluent_form_embded_post_id' value='1037' \/><input type=\"hidden\" id=\"_fluentform_2_fluentformnonce\" name=\"_fluentform_2_fluentformnonce\" value=\"58be1fac47\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/blog\/wp-json\/wp\/v2\/posts\/1037\" \/><div data-type=\"name-element\" data-name=\"names\" class=\" ff-field_container ff-name-field-wrapper\" ><div class='ff-t-container'><div class='ff-t-cell '><div class='ff-el-group ff-el-form-top'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_names_first_name_' id='label_ff_2_names_first_name_' >Full Name<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"names[first_name]\" id=\"ff_2_names_first_name_\" class=\"ff-el-form-control\" placeholder=\"Enter Your Full Name\" aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><div class='ff-t-cell '><div class='ff-el-group ff-el-form-top'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_names_last_name_' id='label_ff_2_names_last_name_' >Email<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"names[last_name]\" id=\"ff_2_names_last_name_\" class=\"ff-el-form-control\" placeholder=\"Enter Your Email\" aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_input_text' id='label_ff_2_input_text' aria-label=\"Phone Number\">Phone Number<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Enter Your Contact Number\" data-name=\"input_text\" id=\"ff_2_input_text\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><div class=\"ff-name-address-wrapper fluent-address\" data-type=\"address-element\" data-name=\"address_1\" ><div class='ff-el-input--label'><label aria-label=\"Address\">Address<\/label><\/div><div class='ff-el-input--content'><div class='ff-t-container'><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_address_line_1_' id='label_ff_2_address_1_address_line_1_' aria-label=\"Address Line\">Address Line <\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[address_line_1]\" id=\"ff_2_address_1_address_line_1_\" class=\"ff-el-form-control\" placeholder=\"Address Line 1\" data-key_name=\"address_line_1\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_address_line_2_' id='label_ff_2_address_1_address_line_2_' aria-label=\"State\">State<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[address_line_2]\" id=\"ff_2_address_1_address_line_2_\" class=\"ff-el-form-control\" placeholder=\"State\" data-key_name=\"address_line_2\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><div class='ff-t-container'><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_city_' id='label_ff_2_address_1_city_' aria-label=\"Postal Code\">Postal Code<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[city]\" id=\"ff_2_address_1_city_\" class=\"ff-el-form-control\" placeholder=\"Postal Code\" data-key_name=\"city\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_state_' id='label_ff_2_address_1_state_' aria-label=\"Property Type\">Property Type<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[state]\" id=\"ff_2_address_1_state_\" class=\"ff-el-form-control\" placeholder=\"e.g. Single, Double Storey\" data-key_name=\"state\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><div class='ff-t-container'><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_zip_' id='label_ff_2_address_1_zip_' aria-label=\"What is your power phase?\">What is your power phase?<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[zip]\" id=\"ff_2_address_1_zip_\" class=\"ff-el-form-control\" placeholder=\"e.g. Single, 3 Phase\" data-key_name=\"zip\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_description' id='label_ff_2_description' aria-label=\"Your Message\">Your Message<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"true\" aria-labelledby=\"label_ff_2_description\" name=\"description\" id=\"ff_2_description\" class=\"ff-el-form-control\" rows=\"3\" cols=\"2\" data-name=\"description\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Get a Free Quote\">Get a Free Quote<\/button><\/div><\/fieldset><\/form><div id='fluentform_2_errors' class='ff-errors-in-stack ff_form_instance_2_1 ff-form-loading_errors ff_form_instance_2_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_2_1 = {\"id\":\"2\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_2_1\",\"form_id_selector\":\"fluentform_2\",\"rules\":{\"names[first_name]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"names[middle_name]\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"names[last_name]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[address_line_1]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[address_line_2]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[city]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[state]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[zip]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[country]\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"description\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}}},\"debounce_time\":300};\n                            <\/script>\n            ","protected":false},"excerpt":{"rendered":"<p>Homeowners in Clyde VIC 3978 are moving fast to secure high government rebates before they reduce after April. This recently completed 7.99kW solar and 44.8kWh battery installation in Clyde VIC for our client Jaspreet demonstrates how combining premium solar panels with large-capacity battery storage can dramatically cut power bills and future-proof your home. With rising &#8230; <a title=\"7.99kW Solar &amp; 44.8kWh Battery Installation in Clyde Melbourne VIC 3978\" class=\"read-more\" href=\"https:\/\/greenelectricsolutions.com.au\/blog\/7-99kw-solar-44-8kwh-battery-installation-in-clyde-vic-3978\/\" aria-label=\"Read more about 7.99kW Solar &amp; 44.8kWh Battery Installation in Clyde Melbourne VIC 3978\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":1053,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"categories":[2,7],"tags":[],"class_list":["post-1037","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-installation","category-solar-installation"],"_links":{"self":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/1037","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/comments?post=1037"}],"version-history":[{"count":15,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/1037\/revisions"}],"predecessor-version":[{"id":1426,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/1037\/revisions\/1426"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/media\/1053"}],"wp:attachment":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/media?parent=1037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/categories?post=1037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/tags?post=1037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}