{"id":5025,"date":"2026-10-02T10:36:28","date_gmt":"2026-10-02T10:36:28","guid":{"rendered":"https:\/\/greenelectricsolutions.com.au\/blog\/?p=5025"},"modified":"2026-10-02T12:25:54","modified_gmt":"2026-10-02T12:25:54","slug":"commercial-solar-installation-shepparton-rossiter-constructions","status":"publish","type":"post","link":"https:\/\/greenelectricsolutions.com.au\/blog\/commercial-solar-installation-shepparton-rossiter-constructions\/","title":{"rendered":"95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Commercial solar is increasingly becoming an important part of how Victorian businesses manage energy costs and improve on-site electricity generation. After successfully completing solar installations acros<a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/commercial-solar-installation-st-albans-rossiter-constructions\/\">s <strong>12 units for Rossiter Constructions Pty Ltd in St Albans<\/strong><\/a>, <strong><a href=\"https:\/\/greenelectricsolutions.com.au\/\">Green Electric Solutions<\/a><\/strong> has continued the project with <strong>19 additional commercial units at Ben Bialek 16 Industrial Road, Shepparton VIC 3630<\/strong>, delivering a combined <strong>95kW<\/strong> of solar capacity through individually configured systems designed around the electrical requirements and installation conditions of each property.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Explore Your Commercial Energy Options<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">95kW of Commercial Solar Across 19 Units Shepparton, Victoria<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The latest stage of the Rossiter Constructions project covers <strong>Units 1\u201319<\/strong> <strong>at<\/strong> <strong>Ben Bialek 16 Industrial Road, Shepparton VIC 3630<\/strong>, with Green Electric Solutions completing individual solar installations across the commercial development. Together, the systems represent a substantial multi-unit solar rollout, with the key project figures documented below.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Project Detail<\/th><th>Project Information<\/th><\/tr><\/thead><tbody><tr><td><strong>Client<\/strong><\/td><td>Rossiter Constructions Pty Ltd<\/td><\/tr><tr><td><strong>Project Location<\/strong><\/td><td>Ben Bialek 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td><strong>Project Type<\/strong><\/td><td>Commercial Solar Installations<\/td><\/tr><tr><td><strong>Additional Units<\/strong><\/td><td>19<\/td><\/tr><tr><td><strong>Combined Solar Capacity<\/strong><\/td><td>95kW<\/td><\/tr><tr><td><strong>Estimated Annual Production<\/strong><\/td><td>140,829 kWh<\/td><\/tr><tr><td><strong>Estimated Annual Savings<\/strong><\/td><td>$4,313.93<\/td><\/tr><tr><td><strong>Installer and Designer<\/strong><\/td><td>Habib by Green Electric Solutions<\/td><\/tr><tr><td><strong>Project Status<\/strong><\/td><td>Completed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<pre class=\"wp-block-preformatted has-background\" style=\"background-color:#eda321\"><strong>Project Configuration:<\/strong> Each of the 19 commercial units has its own independently configured solar system, with equipment and capacity tailored to the requirements of each unit.<\/pre>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Ready to Assess Your Commercial Solar Needs?<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">19 Commercial Solar Installations, Documented Unit by Unit by Green Electric Solutions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A multi-unit commercial project is not simply about adding up solar panels. <strong>System capacity, inverter selection, roof configuration, electrical requirements and compliance considerations<\/strong> all contribute to the final installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For <a href=\"https:\/\/greenelectricsolutions.com.au\/\">us<\/a>, delivering a project of this scale means considering the requirements of each commercial property while maintaining a consistent standard of installation across the wider development.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sections below document each Rossiter Constructions unit individually, providing a clearer view of how the wider <strong>95kW commercial solar project<\/strong> has been delivered across the development.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 1 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The<strong> first documented installation<\/strong> is a <strong>5kW grid-connected solar PV system<\/strong>, comprising <strong>8 JA Solar 625W panels<\/strong> paired with a <strong>Fronius Symo 10.0-3-M inverter<\/strong>. The system was installed as a new solar installation without battery storage and is eligible for <strong>34 STCs<\/strong> under the documented five-year deeming period.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Installation Detail<\/th><th>Unit 1 Information<\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial, Multi-storey<\/td><\/tr><tr><td><strong>System Type<\/strong><\/td><td>New Solar PV System<\/td><\/tr><tr><td><strong>Solar Capacity<\/strong><\/td><td>5kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar 625W<\/td><\/tr><tr><td><strong>Panel Model<\/strong><\/td><td>JAM66D45-625\/LB<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Grid Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>None<\/td><\/tr><tr><td><strong>STCs<\/strong><\/td><td>34<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>4 September 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Switchboard works and required electrical upgrades were completed to integrate the solar system safely with the existing electrical infrastructure, including required protection, isolation, labelling and compliance measures.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"946\" height=\"680\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5045\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1.webp 946w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1-300x216.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1-768x552.webp 768w\" sizes=\"auto, (max-width: 946px) 100vw, 946px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 2 \u2013 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 2 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Installation Detail<\/th><th>Unit 2 Information<\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial, Multi-storey<\/td><\/tr><tr><td><strong>System Type<\/strong><\/td><td>New Solar PV System<\/td><\/tr><tr><td><strong>Solar Capacity<\/strong><\/td><td>5kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar 625W<\/td><\/tr><tr><td><strong>Panel Model<\/strong><\/td><td>JAM66D45-625\/LB<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Grid Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>None<\/td><\/tr><tr><td><strong>STCs<\/strong><\/td><td>34<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>4 September 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The system was installed with the required <strong>electrical safety, switchboard and compliance measures<\/strong>, including appropriate protection, isolation and labelling to support a safe and compliant solar connection.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"669\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-3-1024x669.webp\" alt=\"95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions\" class=\"wp-image-5049\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-3-1024x669.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-3-300x196.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-3-767x501.webp 767w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-3.webp 1111w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 3 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 3 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Installation Detail<\/th><th>Unit 3 Information<\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial, Multi-storey<\/td><\/tr><tr><td><strong>System Type<\/strong><\/td><td>New Solar PV System<\/td><\/tr><tr><td><strong>Solar Capacity<\/strong><\/td><td>5kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar 625W<\/td><\/tr><tr><td><strong>Panel Model<\/strong><\/td><td>JAM66D45-625\/LB<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Grid Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>None<\/td><\/tr><tr><td><strong>STCs<\/strong><\/td><td>34<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>4 September 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project documentation confirms that <strong>CEC accreditation, government siting approvals, electrical safety documentation and Australian\/New Zealand standards compliance<\/strong> were addressed. The accredited installer also confirmed on-site attendance, appropriate electrical licensing, approved solar components and completion in accordance with the applicable installation requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"391\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-5-1024x391.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5057\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-5-1024x391.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-5-300x114.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-5-768x293.webp 768w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-5.webp 1216w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 4 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 4 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Installation Detail<\/th><th>Unit 4 Information<\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial, Multi-storey<\/td><\/tr><tr><td><strong>System Type<\/strong><\/td><td>New Solar PV System<\/td><\/tr><tr><td><strong>Solar Capacity<\/strong><\/td><td>5kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar 625W<\/td><\/tr><tr><td><strong>Panel Model<\/strong><\/td><td>JAM66D45-625\/LB<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Grid Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>None<\/td><\/tr><tr><td><strong>STCs<\/strong><\/td><td>34<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>4 September 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Project records confirm that the required <strong>electrical safety documentation, government approvals and accreditation requirements<\/strong> were addressed. The installation was designed and supervised by the accredited installer, with approved components and the necessary compliance documentation provided for the completed grid-connected system.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"399\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-7-1024x399.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5061\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-7-1024x399.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-7-300x117.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-7-768x299.webp 768w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-7.webp 1130w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 5 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 5 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Installation Detail<\/th><th>Unit 5 Information<\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial, Multi-storey<\/td><\/tr><tr><td><strong>System Type<\/strong><\/td><td>New Solar PV System<\/td><\/tr><tr><td><strong>Solar Capacity<\/strong><\/td><td>5kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar 625W<\/td><\/tr><tr><td><strong>Panel Model<\/strong><\/td><td>JAM66D45-625\/LB<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Grid Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>None<\/td><\/tr><tr><td><strong>STCs<\/strong><\/td><td>34<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>4 September 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project records confirm the required <strong>electrical safety documentation, government approvals and accreditation requirements<\/strong> were addressed. The system was designed and installed under the applicable accreditation requirements, with approved components and supporting compliance documentation provided for the completed installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-11-1024x538.webp\" alt=\"95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions\" class=\"wp-image-5072\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-11-1024x538.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-11-767x403.webp 767w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-11-300x158.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-11.webp 1241w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 6 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 6 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Project Detail<\/th><th>Unit 6<\/th><\/tr><\/thead><tbody><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-Storey<\/td><\/tr><tr><td>Location<\/td><td>Unit 6 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>4 September 2026<\/td><\/tr><tr><td>Solar System Size<\/td><td>5 kW<\/td><\/tr><tr><td>Solar Panels<\/td><td>8 \u00d7 JA Solar 625 W<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>None<\/td><\/tr><tr><td>Government Support<\/td><td>34 STCs<\/td><\/tr><tr><td>Installation Type<\/td><td>New Solar System<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The electrical installation was completed in accordance with applicable Victorian <strong>electrical safety<\/strong> requirements. The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS\/NZS requirements. Required <strong>electrical safety<\/strong>, <strong>CEC accreditation<\/strong> and<strong> Australian\/New Zealand<\/strong> standards documentation was provided for the installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"401\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-12-1024x401.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5074\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-12-1024x401.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-12-300x118.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-12-766x300.webp 766w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-12.webp 1406w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 7 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 7 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th>Project Detail<\/th><th>Unit 7<\/th><\/tr><\/thead><tbody><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-Storey<\/td><\/tr><tr><td>Location<\/td><td>Unit 7 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>4 September 2026<\/td><\/tr><tr><td>Solar System Size<\/td><td>5 kW<\/td><\/tr><tr><td>Solar Panels<\/td><td>8 \u00d7 JA Solar 625 W<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>None<\/td><\/tr><tr><td>Government Support<\/td><td>34 STCs<\/td><\/tr><tr><td>Installation Type<\/td><td>New Solar System<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS\/NZS 4777.2:2020 requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Required electrical safety, CEC accreditation and Australian\/New Zealand standards documentation was provided for the installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"737\" height=\"582\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-14.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5077\" style=\"width:820px;height:auto\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-14.webp 737w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-14-300x237.webp 300w\" sizes=\"auto, (max-width: 737px) 100vw, 737px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 8 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 8 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>..<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><tbody><tr><th>Project Detail<\/th><th>Unit 8<\/th><\/tr><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-Storey<\/td><\/tr><tr><td>Location<\/td><td>Unit 8 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>4 September 2026<\/td><\/tr><tr><td>Solar System Size<\/td><td>5 kW<\/td><\/tr><tr><td>Solar Panels<\/td><td>8 \u00d7 JA Solar 625 W<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>None<\/td><\/tr><tr><td>Government Support<\/td><td>34 STCs<\/td><\/tr><tr><td>Installation Type<\/td><td>New Solar System<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS\/NZS 4777.2:2020 requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Required electrical safety, CEC accreditation and Australian\/New Zealand standards documentation was provided for the installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"752\" height=\"742\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1.png\" alt=\"95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions\" class=\"wp-image-5081\" style=\"width:820px;height:auto\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1.png 752w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-1-300x296.png 300w\" sizes=\"auto, (max-width: 752px) 100vw, 752px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 9 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 9 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><tbody><tr><th>Project Detail<\/th><th>Unit 9<\/th><\/tr><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-Storey<\/td><\/tr><tr><td>Location<\/td><td>Unit 9 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>4 September 2026<\/td><\/tr><tr><td>Solar System Size<\/td><td>5 kW<\/td><\/tr><tr><td>Solar Panels<\/td><td>8 \u00d7 JA Solar 625 W<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>None<\/td><\/tr><tr><td>Government Support<\/td><td>34 STCs<\/td><\/tr><tr><td>Installation Type<\/td><td>New Solar System<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS\/NZS 4777.2:2020 requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Required electrical safety, CEC accreditation and Australian\/New Zealand standards documentation was provided for the installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"765\" height=\"764\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-16.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5090\" style=\"width:820px;height:auto\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-16.webp 765w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-16-150x150.webp 150w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-16-300x300.webp 300w\" sizes=\"auto, (max-width: 765px) 100vw, 765px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 10 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 10 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>4 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 10<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td><strong>Location<\/strong><\/td><td>Unit 10 \/ 16\u201318 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>04\/09\/2026<\/td><\/tr><tr><td><strong>Solar System Size<\/strong><\/td><td>5 kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar JAM66D45-625\/LB, 625 W each<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>No<\/td><\/tr><tr><td><strong>Government Support<\/strong><\/td><td>34 STCs<\/td><\/tr><tr><td><strong>Installation Type<\/strong><\/td><td>New system<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS\/NZS 4777.2:2020 requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Required electrical safety, CEC accreditation and Australian\/New Zealand standards documentation was provided for the installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"804\" height=\"821\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-18.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5094\" style=\"width:820px;height:auto\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-18.webp 804w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-18-294x300.webp 294w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-18-768x784.webp 768w\" sizes=\"auto, (max-width: 804px) 100vw, 804px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 11 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 11 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 11<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Property Type<\/strong><\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td><strong>Location<\/strong><\/td><td>Unit 11 \/ 16\u201318 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td><strong>Installation Date<\/strong><\/td><td>12\/09\/2026<\/td><\/tr><tr><td><strong>Solar System Size<\/strong><\/td><td>5 kW<\/td><\/tr><tr><td><strong>Solar Panels<\/strong><\/td><td>8 \u00d7 JA Solar JAM66D45-625\/LB, 625 W each<\/td><\/tr><tr><td><strong>Inverter<\/strong><\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td><strong>Connection<\/strong><\/td><td>Grid-connected<\/td><\/tr><tr><td><strong>Battery Storage<\/strong><\/td><td>No<\/td><\/tr><tr><td><strong>Government Support<\/strong><\/td><td>34 STCs<\/td><\/tr><tr><td><strong>Installation Type<\/strong><\/td><td>New system<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS\/NZS 4777.2:2020 requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Required electrical safety, CEC accreditation and Australian\/New Zealand standards documentation was provided for the installation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"376\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-20-1024x376.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5100\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-20-1024x376.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-20-300x110.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-20-766x281.webp 766w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-20.webp 1450w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 12 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 12 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 12 \u2013 Installation Details<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 12 \/ 16 Industrial AV, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td><strong>5.00 kW<\/strong><\/td><\/tr><tr><td>Number of Panels<\/td><td><strong>8<\/strong><\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td><strong>625 W each<\/strong><\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td><strong>34<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 12 installation met applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, with supporting compliance documentation provided.<br>The grid-connected equipment complied with relevant <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>The system used approved <strong>JA Solar modules<\/strong> and was installed under the applicable accredited installation requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"966\" height=\"384\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-22.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5107\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-22.webp 966w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-22-300x119.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-22-767x305.webp 767w\" sizes=\"auto, (max-width: 966px) 100vw, 966px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 13 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 13 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><tbody><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 13 \u2013 Installation Details<\/strong><\/th><\/tr><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 13 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td><strong>5.00 kW<\/strong><\/td><\/tr><tr><td>Number of Panels<\/td><td><strong>8<\/strong><\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td><strong>625 W each<\/strong><\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td><strong>34<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 13 system was delivered in line with applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, supported by the required compliance documentation.<br>All grid-connected equipment met relevant <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>Approved <strong>JA Solar modules<\/strong> were incorporated, with installation carried out under the applicable accredited requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"332\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-24-1024x332.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5109\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-24-1024x332.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-24-300x97.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-24-766x248.webp 766w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-24.webp 1482w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 14 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 14 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><tbody><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 14 \u2013 Installation Details<\/strong><\/th><\/tr><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 14 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td><strong>5.00 kW<\/strong><\/td><\/tr><tr><td>Number of Panels<\/td><td><strong>8<\/strong><\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td><strong>625 W each<\/strong><\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td><strong>34<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 14 installation fulfilled applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, with the required compliance documentation supplied.<br>The grid-connected equipment met relevant <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>Approved <strong>JA Solar modules<\/strong> were used, with installation completed under the applicable accredited requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"402\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-38-1024x402.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5159\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-38-1024x402.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-38-300x118.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-38-766x301.webp 766w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-38.webp 1484w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 15 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 15 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><tbody><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 15 \u2013 Installation Details<\/strong><\/th><\/tr><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 15 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td><strong>5.00 kW<\/strong><\/td><\/tr><tr><td>Number of Panels<\/td><td><strong>8<\/strong><\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td><strong>625 W each<\/strong><\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td><strong>34<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 15 installation fulfilled relevant <strong>electrical safety, technical and accreditation requirements<\/strong>, with the necessary compliance documentation provided.<br>The grid-connected equipment met applicable <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>Approved <strong>JA Solar modules<\/strong> were used, with the system installed in accordance with accredited installation requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"402\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-28-1024x402.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5119\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-28-1024x402.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-28-300x118.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-28-768x301.webp 768w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-28.webp 1367w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 16 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 17 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><tbody><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Unit 16 \u2013 Installation Details<\/strong><\/th><\/tr><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 16 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td><strong>5.00 kW<\/strong><\/td><\/tr><tr><td>Number of Panels<\/td><td><strong>8<\/strong><\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td><strong>625 W each<\/strong><\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td><strong>34<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 16 installation fulfilled applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, with relevant compliance documentation supplied.<br>The grid-connected equipment met the applicable <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>Approved <strong>JA Solar modules<\/strong> were installed in accordance with the required accredited installation procedures.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"409\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-30-1024x409.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5123\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-30-1024x409.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-30-300x120.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-30-767x306.webp 767w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-30.webp 1421w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 17 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 17 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project Details<\/h3>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Information<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 17 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td>5.00 kW<\/td><\/tr><tr><td>Number of Panels<\/td><td>8<\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td>625 W each<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td>34<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 17 installation satisfied applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, with the necessary compliance documentation supplied.<br>The grid-connected equipment met relevant <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>Approved <strong>JA Solar modules<\/strong> were used, with installation completed in accordance with applicable accredited requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"402\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-32-1024x402.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5126\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-32-1024x402.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-32-300x118.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-32-767x301.webp 767w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-32.webp 1360w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 18 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 18 received a <strong>5.00kW grid-connected solar system<\/strong> comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project Details<\/h3>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Information<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 18 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td>5.00 kW<\/td><\/tr><tr><td>Number of Panels<\/td><td>8<\/td><\/tr><tr><td>Panel Manufacturer<\/td><td>JA Solar Technology Co Ltd<\/td><\/tr><tr><td>Panel Capacity<\/td><td>625 W each<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td>34<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 18 installation fulfilled applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, supported by the required compliance documentation.<br>The grid-connected equipment met relevant <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>The system incorporated approved <strong>JA Solar modules<\/strong> and was installed in accordance with applicable accredited installation requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"403\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-34-1024x403.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5129\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-34-1024x403.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-34-300x118.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-34-767x302.webp 767w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-34.webp 1423w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Unit 19 \u2014 Commercial Solar Installation Rossiter Constructions Shepparton<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Unit 19 received a <strong>5.00kW grid-connected solar system<\/strong> comprising<strong> 8 JA Solar 625W panels<\/strong> and a dedicated Fronius inverter. The installation was completed on <strong>12 September 2026<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project Details<\/h3>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Project Detail<\/strong><\/th><th><strong>Information<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Property Type<\/td><td>Commercial \u2013 Multi-storey<\/td><\/tr><tr><td>Installation Address<\/td><td>Unit 19 \/ 16 Industrial Road, Shepparton VIC 3630<\/td><\/tr><tr><td>Installation Date<\/td><td>12 September 2026<\/td><\/tr><tr><td>System Type<\/td><td>New Solar PV System<\/td><\/tr><tr><td>Solar Capacity<\/td><td>5.00 kW<\/td><\/tr><tr><td>Number of Panels<\/td><td>8<\/td><\/tr><tr><td>Panel Capacity<\/td><td>625 W each<\/td><\/tr><tr><td>Inverter<\/td><td>Fronius Symo 10.0-3-M<\/td><\/tr><tr><td>Connection<\/td><td>Grid-connected<\/td><\/tr><tr><td>Battery Storage<\/td><td>No<\/td><\/tr><tr><td>STCs<\/td><td>34<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Switchboard &amp; Electrical Compliance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The Unit 19 installation met applicable <strong>electrical safety, technical and accreditation requirements<\/strong>, with supporting compliance documentation provided.<br>The grid-connected equipment complied with relevant <strong>Australian\/New Zealand standards and technical requirements<\/strong>.<br>The system used approved <strong>JA Solar modules<\/strong> and was installed under the applicable accredited installation requirements.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"414\" src=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-36-1024x414.webp\" alt=\"95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions\" class=\"wp-image-5132\" srcset=\"https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-36-1024x414.webp 1024w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-36-300x121.webp 300w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-36-767x310.webp 767w, https:\/\/greenelectricsolutions.com.au\/blog\/wp-content\/uploads\/2026\/09\/95kW-Commercial-Solar-Shepparton-Victoria-Rossiter-Constructions-Expands-Across-19-More-Units-Green-Electric-Solutions-36.webp 1338w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Government Rebates Supporting in Expanding Solar   Project in Rossiter Construction, Shepparton<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project documentation records <strong>656 Small-scale Technology Certificates (STCs)<\/strong> at <strong>$38.00 per certificate<\/strong>, delivering a documented government rebate of <strong>$24,928.00<\/strong> across the completed installations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Victorian businesses completing commercial solar between <strong>30kW and 200kW<\/strong> may also be eligible for the <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/commercial-solar-installation-veu-discounts-federal-rebates-victoria\/\"><strong>VEU Commercial Solar discount<\/strong><\/a> stacked on top of federal STCs \u2014 potentially reducing upfront costs significantly further. Green Electric Solutions is an <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/veu-commercial-solar-provider-victoria\/\"><strong>officially listed VEU Commercial Solar provider in Victoria<\/strong><\/a>, meaning eligible Melbourne businesses can access both incentive streams through a single installer.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th class=\"has-text-align-left\" data-align=\"left\">Government Rebate<\/th><th class=\"has-text-align-center\" data-align=\"center\">Calculation<\/th><th>Rebate Value<\/th><\/tr><\/thead><tbody><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Small-scale Technology Certificates (STCs)<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">656 \u00d7 $38.00<\/td><td><strong>$24,928.00<\/strong><\/td><\/tr><tr><td class=\"has-text-align-left\" data-align=\"left\"><strong>Total Government Rebates<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\">\u2014<\/td><td><strong>$24,928.00<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<pre class=\"wp-block-preformatted has-background\" style=\"background-color:#eda321\"><strong>Important:<\/strong> Rebate figures are based on the supplied project documentation. Eligibility and certificate values may vary according to applicable program rules and project circumstances.<\/pre>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Explore Commercial Solar Rebates<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Green Electric Solutions \u2014 Your Best Local Commercial Solar Partner Across Melbourne<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/greenelectricsolutions.com.au\/\">Green Electric Solutions<\/a> combines <strong>local Victorian expertise, qualified professionals and recognised industry approvals<\/strong> to deliver compliant commercial solar solutions. Our team manages the project from system design and equipment selection through installation, electrical compliance, commissioning and applicable incentive documentation. This provides Melbourne businesses with a professionally managed solar solution backed by relevant industry credentials.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Approval \/ Accreditation<\/strong><\/th><th><strong>What It Represents<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>CEC Accredited<\/strong><\/td><td>Demonstrates recognised competency in solar PV system design and installation.<\/td><\/tr><tr><td><strong><a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/victoria-solar-battery-hvac-heat-pump-installer\/#net-approved\">NET Approved<\/a><\/strong><\/td><td>Approved to participate in the relevant New Energy Tech installation framework.<\/td><\/tr><tr><td><strong><a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/victoria-solar-battery-hvac-heat-pump-installer\/#solar-victoria-approved\">Solar Victoria Approved<\/a><\/strong><\/td><td>Approved installer for eligible Victorian solar programs.<\/td><\/tr><tr><td><strong><a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/victoria-solar-battery-hvac-heat-pump-installer\/#veu-approved\">VEU Approved Installer<\/a><\/strong><\/td><td>Approved to deliver eligible energy-efficiency upgrades under the Victorian Energy Upgrades program.<\/td><\/tr><tr><td><strong>SAA-Certified Electricians<\/strong><\/td><td>Qualified electrical professionals supporting compliant electrical installation work.<\/td><\/tr><tr><td><strong>GoodWe Approved Installer<\/strong><\/td><td>Recognised installer status for GoodWe energy products and systems.<\/td><\/tr><tr><td><strong>AS\/NZS Compliance<\/strong><\/td><td>Systems are installed in accordance with applicable Australian and New Zealand standards.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As a <strong>local and highly qualified Victorian solar company<\/strong>, Green Electric Solutions understands the requirements of Melbourne commercial properties and Victorian energy programs. Our experienced team provides businesses with a streamlined service covering <strong>solar design, installation, electrical works, compliance, commissioning and <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/veu-commercial-solar-provider-victoria\/\">available government incentive documentation<\/a><\/strong>.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Talk to a Commercial Solar Specialist<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Our Service Area \u2014 Within 80 km of Altona<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Green Electric Solutions services <strong>commercial properties within an<a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/victoria-solar-battery-hvac-heat-pump-installer\/#findyoursuburb\"> 80 km radius of Altona<\/a><\/strong>, covering Melbourne and surrounding suburbs including <strong>Point Cook, Werribee, Tarneit, Truganina, Hoppers Crossing, Melton, Caroline Springs, St Albans, Sunbury, Craigieburn and Mickleham<\/strong>. Our local team provides professional solar, electrical and energy solutions with direct access to qualified specialists.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-background wp-element-button\" href=\"#contact\" style=\"background-color:#5e843a\">Find Your Commercial Suburb<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Commercial Solar FAQs by Victorians<\/h2>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\"><strong>How much does a commercial solar system cost in Victoria?<\/strong><br>Pricing depends on system size, site conditions, equipment, switchboard work, structural requirements and grid-connection requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What rebates and incentives are available for commercial solar in Victoria?<\/strong><br>Victorian businesses may be eligible for incentives including the <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/commercial-solar-installation-veu-discounts-federal-rebates-victoria\/\"><strong>VEU Commercial and Industrial Solar PV discount<\/strong><\/a> for eligible systems, while eligible systems may also qualify for federal STCs. Current VEU rules cover systems from <strong>30 kW to 200 kW<\/strong>, with larger systems potentially addressed through project-based activities. Green Electric Solutions is a <a href=\"https:\/\/greenelectricsolutions.com.au\/blog\/veu-commercial-solar-provider-victoria\/\"><strong>listed VEU Commercial Solar provider in Victoria<\/strong><\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How much can a business save with commercial solar?<\/strong><br>Savings depend primarily on electricity consumption, tariff structure, system production and how much solar energy the business uses directly rather than exporting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What size solar system does my business need?<\/strong><br>The system should be sized around the business&#8217;s electricity consumption, operating hours, available roof space and desired level of grid independence. Daytime electricity usage is particularly important because solar generation occurs during daylight hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can my commercial property export excess solar electricity to the grid?<\/strong><br><strong>Not necessarily.<\/strong> The local electricity distributor determines connection and export conditions. Export limits can affect how much surplus electricity a business can send to the grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Do I need grid-connection approval before installing commercial solar?<\/strong><br>Grid connection generally requires approval from the relevant <strong>Distribution Network Service Provider (DNSP)<\/strong>, with requirements varying according to system size and the proposed export arrangement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can solar be installed on a factory, warehouse, office or other commercial building?<\/strong><br>Yes, commercial and other non-residential premises can be eligible for Victorian commercial solar incentives, subject to the applicable program requirements. The current VEU commercial and industrial activity includes businesses, factories, community buildings, schools and hospitals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can my commercial solar system include a battery?<\/strong><br>Yes. A battery can store excess solar generated during the day for later use. Businesses considering future battery installation should discuss battery compatibility when selecting their solar system and inverter.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What approvals, standards and qualifications are required for commercial solar installation in Victoria?<\/strong><br>Commercial solar installations must meet applicable electrical, product and installation requirements. For relevant Victorian programs, installer accreditation, electrical licensing and approved products are important compliance considerations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How long does commercial solar installation take?<\/strong><br>The timeframe depends on system size, engineering, roof and structural requirements, switchboard work, equipment availability and DNSP\/grid-connection approval. Larger commercial projects can require more extensive design and approval work<\/p>\n<\/div><\/div>\n\n\n\n<h2 id=\"contact\" class=\"wp-block-heading\">Power Your Business. Future-Proof Your Energy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Contact Green Electric Solutions to explore a tailored commercial solar solution aligned with your business&#8217;s energy needs, savings goals and available rebates\u2014simply by filling out the form below.<\/p>\n\n\n<div class='fluentform ff-default fluentform_wrapper_2  ff_guten_block ff_guten_block-2 ffs_default_wrap'><form data-form_id=\"2\" id=\"fluentform_2\" class=\"frm-fluent-form fluent_form_2 ff-el-form-top ff_form_instance_2_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_2_1\" method=\"POST\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">blog lead<\/legend><input type='hidden' name='__fluent_form_embded_post_id' value='5025' \/><input type=\"hidden\" id=\"_fluentform_2_fluentformnonce\" name=\"_fluentform_2_fluentformnonce\" value=\"08c4ea1037\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/blog\/wp-json\/wp\/v2\/posts\/5025\" \/><div data-type=\"name-element\" data-name=\"names\" class=\" ff-field_container ff-name-field-wrapper\" ><div class='ff-t-container'><div class='ff-t-cell '><div class='ff-el-group ff-el-form-top'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_names_first_name_' id='label_ff_2_names_first_name_' >Full Name<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"names[first_name]\" id=\"ff_2_names_first_name_\" class=\"ff-el-form-control\" placeholder=\"Enter Your Full Name\" aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><div class='ff-t-cell '><div class='ff-el-group ff-el-form-top'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_names_last_name_' id='label_ff_2_names_last_name_' >Email<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"names[last_name]\" id=\"ff_2_names_last_name_\" class=\"ff-el-form-control\" placeholder=\"Enter Your Email\" aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_input_text' id='label_ff_2_input_text' aria-label=\"Phone Number\">Phone Number<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Enter Your Contact Number\" data-name=\"input_text\" id=\"ff_2_input_text\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><div class=\"ff-name-address-wrapper fluent-address\" data-type=\"address-element\" data-name=\"address_1\" ><div class='ff-el-input--label'><label aria-label=\"Address\">Address<\/label><\/div><div class='ff-el-input--content'><div class='ff-t-container'><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_address_line_1_' id='label_ff_2_address_1_address_line_1_' aria-label=\"Address Line\">Address Line <\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[address_line_1]\" id=\"ff_2_address_1_address_line_1_\" class=\"ff-el-form-control\" placeholder=\"Address Line 1\" data-key_name=\"address_line_1\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_address_line_2_' id='label_ff_2_address_1_address_line_2_' aria-label=\"State\">State<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[address_line_2]\" id=\"ff_2_address_1_address_line_2_\" class=\"ff-el-form-control\" placeholder=\"State\" data-key_name=\"address_line_2\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><div class='ff-t-container'><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_city_' id='label_ff_2_address_1_city_' aria-label=\"Postal Code\">Postal Code<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[city]\" id=\"ff_2_address_1_city_\" class=\"ff-el-form-control\" placeholder=\"Postal Code\" data-key_name=\"city\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_state_' id='label_ff_2_address_1_state_' aria-label=\"Property Type\">Property Type<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[state]\" id=\"ff_2_address_1_state_\" class=\"ff-el-form-control\" placeholder=\"e.g. Single, Double Storey\" data-key_name=\"state\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><div class='ff-t-container'><div class='ff-t-cell'><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_address_1_zip_' id='label_ff_2_address_1_zip_' aria-label=\"What is your power phase?\">What is your power phase?<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"address_1[zip]\" id=\"ff_2_address_1_zip_\" class=\"ff-el-form-control\" placeholder=\"e.g. Single, 3 Phase\" data-key_name=\"zip\"  aria-invalid=\"false\" aria-required=true><\/div><\/div><\/div><\/div><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_2_description' id='label_ff_2_description' aria-label=\"Your Message\">Your Message<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"true\" aria-labelledby=\"label_ff_2_description\" name=\"description\" id=\"ff_2_description\" class=\"ff-el-form-control\" rows=\"3\" cols=\"2\" data-name=\"description\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Get a Free Quote\">Get a Free Quote<\/button><\/div><\/fieldset><\/form><div id='fluentform_2_errors' class='ff-errors-in-stack ff_form_instance_2_1 ff-form-loading_errors ff_form_instance_2_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_2_1 = {\"id\":\"2\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_2_1\",\"form_id_selector\":\"fluentform_2\",\"rules\":{\"names[first_name]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"names[middle_name]\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"names[last_name]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[address_line_1]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[address_line_2]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[city]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[state]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[zip]\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"address_1[country]\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"description\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}}},\"debounce_time\":300};\n                            <\/script>\n            ","protected":false},"excerpt":{"rendered":"<p>Commercial solar is increasingly becoming an important part of how Victorian businesses manage energy costs and improve on-site electricity generation. After successfully completing solar installations across 12 units for Rossiter Constructions Pty Ltd in St Albans, Green Electric Solutions has continued the project with 19 additional commercial units at Ben Bialek 16 Industrial Road, Shepparton &#8230; <a title=\"95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions\" class=\"read-more\" href=\"https:\/\/greenelectricsolutions.com.au\/blog\/commercial-solar-installation-shepparton-rossiter-constructions\/\" aria-label=\"Read more about 95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":5151,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"pagelayer_contact_templates":[],"_pagelayer_content":"","footnotes":""},"categories":[7,5,34],"tags":[],"class_list":["post-5025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar-installation","category-case-studies","category-commercial-solar-installation"],"_links":{"self":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/5025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/comments?post=5025"}],"version-history":[{"count":97,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/5025\/revisions"}],"predecessor-version":[{"id":5184,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/5025\/revisions\/5184"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/media\/5151"}],"wp:attachment":[{"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/media?parent=5025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/categories?post=5025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greenelectricsolutions.com.au\/blog\/wp-json\/wp\/v2\/tags?post=5025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}