280L Midea Heat Pump Hot Water Upgrade In Doreen
As a family grows, daily hot-water demand often increases, making an undersized or older system less practical to run. In this Doreen, VIC project, Green Electric Solutions upgraded an existing 135L natural-gas storage hot water system to a 280L Midea heat pump hot water system, providing more storage capacity with a more energy-efficient heating method.
The old gas system used approximately 30 MJ/h (8.33 kWh/h) of gas energy while firing, whereas the new Midea heat pump has a rated COP of 4.6. At rated conditions, it can provide approximately 2.5 kW of heating output using around 0.54 kW of electrical input. This upgrade demonstrates how selecting the right system capacity and technology can better match a growing household’s hot-water needs while reducing the energy required to produce hot water.
From 135L Gas To 280L Electric Heat Pump Upgrade
This single-story, four-plus-bedroom home needed greater hot-water capacity to meet the household’s growing needs. Instead of replacing the existing gas storage heater, Green Electric Solutions upgraded the property to a 280L Midea heat pump hot water system, providing increased storage capacity while removing the gas hot-water appliance from service.
The system uses R290 refrigerant and is designed for external installation. The heat-pump assembly is positioned above the storage tank, allowing the system to extract heat from the surrounding air and transfer that heat into the stored water.
| System Component | Installed Specification |
|---|---|
| System Type | Midea Heat Pump Hot Water System |
| Storage Capacity | 280 Litres |
| Rated COP | 4.6 |
| Heating Capacity | 2.5 kW |
| Electrical Input | Approximately 0.54 kW at rated conditions |
| Previous System | 135L Gas Hot Water System |
How VEU Incentives Reduced Cost of This Doreen Installation
The VEEC documentation classifies this project under 3C – Heat Pump Replacing Gas. The installed product price was $3,396 including GST, while the recorded consumer payment was $1,200 including GST after applicable incentives. These figures apply specifically to this project and should not be considered a standard rebate amount for all Victorian heat pump installations.
| Rebate / Cost Item | Amount |
|---|---|
| 17 STCs × $38.00 | −$646.00 |
| VEEC Incentive | −$550.00 |
| Solar Victoria PV Rebate | −$1,000.00 |
| Total Government STCs / Rebates | $2,196.00 |
| Total Consumer Payment (Incl. GST) | $1,200.00 |
How the 280L Heat Pump Was Electrically Connected
The electrical installation involved connecting the new 280L heat pump to the property’s existing electrical supply. The power cable routed neatly along the external wall, with the heat pump connected through dedicated switching and protection at the switchboard.

An external isolation point was also provided, allowing the system to be safely isolated for servicing and maintenance. The completed electrical work provides a secure and organised connection between the heat pump and the home’s electrical system.
Green Electric Solutions serves homeowners across an 80 km radius of Altona, providing a one-stop energy solution for solar, batteries, HVAC, hot water systems, and water filtration.
Professional Plumbing, PTR Valve & Drainage Installation
The plumbing work connected the new 280L storage tank to the property’s existing hot- and cold-water services. The installation includes insulated pipework, water connections, isolation components and a PTR (pressure-temperature relief) valve discharge line directed toward the external drainage area. These connections support safe pressure management, reliable hot-water delivery and practical system maintenance. The completed plumbing layout provides a clean connection between the heat pump tank and the home’s existing water infrastructure.
Green Electric Solutions – Victoria’s Most Trusted Heat Pump Installer
Green Electric Solutions is a Victoria-based VEU-approved hot water heat pump installer delivering end-to-end upgrades for residential properties. Our installations cover system sizing, electrical connection, plumbing, PTR discharge, drainage, and gas-system decommissioning where required. Each project is approached around the property’s hot-water demand, existing services and installation requirements, with practical attention to safe, compliant and professionally finished workmanship.

If you are willing to replacing an ageing gas hot water system or considering a 280L heat pump hot water system in Doreen or surrounding Melbourne suburbs, Green Electric Solutions can assess your existing system, determine suitable sizing and explain available upgrade pathways.
Contact Us
Recent Heat Pump Hot Water Installations Across Victoria
- Werribee Gas Hot Water Replaced With 320L Neopower Heat Pump
- Upgrade Your Roxburgh Park Home With NeoPower 320L Hot Water Heat Pump
- How a Point Cook Homeowner Saved $2,134 on a 320L Heat Pump Upgrade
- Mickleham Homeowner Saved $1,684 with a 320L Heat Pump Upgrade
- 320L Hot Water Heat Pump Installation in Point Cook for only $2,350