95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions

Commercial solar is increasingly becoming an important part of how Victorian businesses manage energy costs and improve on-site electricity generation. After successfully completing solar installations across 12 units for Rossiter Constructions Pty Ltd in St Albans, Green Electric Solutions has continued the project with 19 additional commercial units at Ben Bialek 16 Industrial Road, Shepparton VIC 3630, delivering a combined 95kW of solar capacity through individually configured systems designed around the electrical requirements and installation conditions of each property.

95kW of Commercial Solar Across 19 Units Shepparton, Victoria

The latest stage of the Rossiter Constructions project covers Units 1–19 at Ben Bialek 16 Industrial Road, Shepparton VIC 3630, with Green Electric Solutions completing individual solar installations across the commercial development. Together, the systems represent a substantial multi-unit solar rollout, with the key project figures documented below.

Project DetailProject Information
ClientRossiter Constructions Pty Ltd
Project LocationBen Bialek 16 Industrial Road, Shepparton VIC 3630
Project TypeCommercial Solar Installations
Additional Units19
Combined Solar Capacity95kW
Estimated Annual Production140,829 kWh
Estimated Annual Savings$4,313.93
Installer and DesignerHabib by Green Electric Solutions
Project StatusCompleted
Project Configuration: Each of the 19 commercial units has its own independently configured solar system, with equipment and capacity tailored to the requirements of each unit.

19 Commercial Solar Installations, Documented Unit by Unit by Green Electric Solutions

A multi-unit commercial project is not simply about adding up solar panels. System capacity, inverter selection, roof configuration, electrical requirements and compliance considerations all contribute to the final installation.

For us, delivering a project of this scale means considering the requirements of each commercial property while maintaining a consistent standard of installation across the wider development.

The sections below document each Rossiter Constructions unit individually, providing a clearer view of how the wider 95kW commercial solar project has been delivered across the development.

Unit 1 — Commercial Solar Installation Rossiter Constructions Shepparton

The first documented installation is a 5kW grid-connected solar PV system, comprising 8 JA Solar 625W panels paired with a Fronius Symo 10.0-3-M inverter. The system was installed as a new solar installation without battery storage and is eligible for 34 STCs under the documented five-year deeming period.

Installation DetailUnit 1 Information
Property TypeCommercial, Multi-storey
System TypeNew Solar PV System
Solar Capacity5kW
Solar Panels8 × JA Solar 625W
Panel ModelJAM66D45-625/LB
InverterFronius Symo 10.0-3-M
Grid ConnectionGrid-connected
Battery StorageNone
STCs34
Installation Date4 September 2026

Switchboard & Compliance

Switchboard works and required electrical upgrades were completed to integrate the solar system safely with the existing electrical infrastructure, including required protection, isolation, labelling and compliance measures.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 2 – Commercial Solar Installation Rossiter Constructions Shepparton

Unit 2 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Installation DetailUnit 2 Information
Property TypeCommercial, Multi-storey
System TypeNew Solar PV System
Solar Capacity5kW
Solar Panels8 × JA Solar 625W
Panel ModelJAM66D45-625/LB
InverterFronius Symo 10.0-3-M
Grid ConnectionGrid-connected
Battery StorageNone
STCs34
Installation Date4 September 2026

Switchboard & Compliance

The system was installed with the required electrical safety, switchboard and compliance measures, including appropriate protection, isolation and labelling to support a safe and compliant solar connection.

95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions

Unit 3 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 3 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Installation DetailUnit 3 Information
Property TypeCommercial, Multi-storey
System TypeNew Solar PV System
Solar Capacity5kW
Solar Panels8 × JA Solar 625W
Panel ModelJAM66D45-625/LB
InverterFronius Symo 10.0-3-M
Grid ConnectionGrid-connected
Battery StorageNone
STCs34
Installation Date4 September 2026

Switchboard & Compliance

The project documentation confirms that CEC accreditation, government siting approvals, electrical safety documentation and Australian/New Zealand standards compliance were addressed. The accredited installer also confirmed on-site attendance, appropriate electrical licensing, approved solar components and completion in accordance with the applicable installation requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 4 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 4 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Installation DetailUnit 4 Information
Property TypeCommercial, Multi-storey
System TypeNew Solar PV System
Solar Capacity5kW
Solar Panels8 × JA Solar 625W
Panel ModelJAM66D45-625/LB
InverterFronius Symo 10.0-3-M
Grid ConnectionGrid-connected
Battery StorageNone
STCs34
Installation Date4 September 2026

Switchboard & Compliance

Project records confirm that the required electrical safety documentation, government approvals and accreditation requirements were addressed. The installation was designed and supervised by the accredited installer, with approved components and the necessary compliance documentation provided for the completed grid-connected system.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 5 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 5 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Installation DetailUnit 5 Information
Property TypeCommercial, Multi-storey
System TypeNew Solar PV System
Solar Capacity5kW
Solar Panels8 × JA Solar 625W
Panel ModelJAM66D45-625/LB
InverterFronius Symo 10.0-3-M
Grid ConnectionGrid-connected
Battery StorageNone
STCs34
Installation Date4 September 2026

Switchboard & Compliance

The project records confirm the required electrical safety documentation, government approvals and accreditation requirements were addressed. The system was designed and installed under the applicable accreditation requirements, with approved components and supporting compliance documentation provided for the completed installation.

95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions

Unit 6 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 6 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Project DetailUnit 6
Property TypeCommercial – Multi-Storey
LocationUnit 6 / 16 Industrial Road, Shepparton VIC 3630
Installation Date4 September 2026
Solar System Size5 kW
Solar Panels8 × JA Solar 625 W
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNone
Government Support34 STCs
Installation TypeNew Solar System

Switchboard & Compliance

The electrical installation was completed in accordance with applicable Victorian electrical safety requirements. The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS/NZS requirements. Required electrical safety, CEC accreditation and Australian/New Zealand standards documentation was provided for the installation.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 7 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 7 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Project DetailUnit 7
Property TypeCommercial – Multi-Storey
LocationUnit 7 / 16 Industrial Road, Shepparton VIC 3630
Installation Date4 September 2026
Solar System Size5 kW
Solar Panels8 × JA Solar 625 W
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNone
Government Support34 STCs
Installation TypeNew Solar System

Switchboard & Compliance

The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.

The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS/NZS 4777.2:2020 requirements.

Required electrical safety, CEC accreditation and Australian/New Zealand standards documentation was provided for the installation.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 8 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 8 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026..

Project DetailUnit 8
Property TypeCommercial – Multi-Storey
LocationUnit 8 / 16 Industrial Road, Shepparton VIC 3630
Installation Date4 September 2026
Solar System Size5 kW
Solar Panels8 × JA Solar 625 W
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNone
Government Support34 STCs
Installation TypeNew Solar System

Switchboard & Compliance

The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.

The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS/NZS 4777.2:2020 requirements.

Required electrical safety, CEC accreditation and Australian/New Zealand standards documentation was provided for the installation.

95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions

Unit 9 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 9 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Project DetailUnit 9
Property TypeCommercial – Multi-Storey
LocationUnit 9 / 16 Industrial Road, Shepparton VIC 3630
Installation Date4 September 2026
Solar System Size5 kW
Solar Panels8 × JA Solar 625 W
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNone
Government Support34 STCs
Installation TypeNew Solar System

Switchboard & Compliance

The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.

The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS/NZS 4777.2:2020 requirements.

Required electrical safety, CEC accreditation and Australian/New Zealand standards documentation was provided for the installation.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 10 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 10 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 4 September 2026.

Project DetailUnit 10
Property TypeCommercial – Multi-storey
LocationUnit 10 / 16–18 Industrial Road, Shepparton VIC 3630
Installation Date04/09/2026
Solar System Size5 kW
Solar Panels8 × JA Solar JAM66D45-625/LB, 625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
Government Support34 STCs
Installation TypeNew system

Switchboard & Compliance

The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.

The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS/NZS 4777.2:2020 requirements.

Required electrical safety, CEC accreditation and Australian/New Zealand standards documentation was provided for the installation.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 11 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 11 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project DetailUnit 11
Property TypeCommercial – Multi-storey
LocationUnit 11 / 16–18 Industrial Road, Shepparton VIC 3630
Installation Date12/09/2026
Solar System Size5 kW
Solar Panels8 × JA Solar JAM66D45-625/LB, 625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
Government Support34 STCs
Installation TypeNew system

Switchboard & Compliance

The electrical installation was completed in accordance with applicable Victorian electrical safety requirements.

The system incorporates compliant grid-connected equipment, including the Fronius inverter meeting AS/NZS 4777.2:2020 requirements.

Required electrical safety, CEC accreditation and Australian/New Zealand standards documentation was provided for the installation.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 12 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 12 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project DetailUnit 12 – Installation Details
Property TypeCommercial – Multi-storey
Installation AddressUnit 12 / 16 Industrial AV, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 12 installation met applicable electrical safety, technical and accreditation requirements, with supporting compliance documentation provided.
The grid-connected equipment complied with relevant Australian/New Zealand standards and technical requirements.
The system used approved JA Solar modules and was installed under the applicable accredited installation requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 13 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 13 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project DetailUnit 13 – Installation Details
Property TypeCommercial – Multi-storey
Installation AddressUnit 13 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 13 system was delivered in line with applicable electrical safety, technical and accreditation requirements, supported by the required compliance documentation.
All grid-connected equipment met relevant Australian/New Zealand standards and technical requirements.
Approved JA Solar modules were incorporated, with installation carried out under the applicable accredited requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 14 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 14 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project DetailUnit 14 – Installation Details
Property TypeCommercial – Multi-storey
Installation AddressUnit 14 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 14 installation fulfilled applicable electrical safety, technical and accreditation requirements, with the required compliance documentation supplied.
The grid-connected equipment met relevant Australian/New Zealand standards and technical requirements.
Approved JA Solar modules were used, with installation completed under the applicable accredited requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 15 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 15 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project DetailUnit 15 – Installation Details
Property TypeCommercial – Multi-storey
Installation AddressUnit 15 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 15 installation fulfilled relevant electrical safety, technical and accreditation requirements, with the necessary compliance documentation provided.
The grid-connected equipment met applicable Australian/New Zealand standards and technical requirements.
Approved JA Solar modules were used, with the system installed in accordance with accredited installation requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 16 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 17 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project DetailUnit 16 – Installation Details
Property TypeCommercial – Multi-storey
Installation AddressUnit 16 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 16 installation fulfilled applicable electrical safety, technical and accreditation requirements, with relevant compliance documentation supplied.
The grid-connected equipment met the applicable Australian/New Zealand standards and technical requirements.
Approved JA Solar modules were installed in accordance with the required accredited installation procedures.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 17 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 17 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project Details

Project DetailInformation
Property TypeCommercial – Multi-storey
Installation AddressUnit 17 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 17 installation satisfied applicable electrical safety, technical and accreditation requirements, with the necessary compliance documentation supplied.
The grid-connected equipment met relevant Australian/New Zealand standards and technical requirements.
Approved JA Solar modules were used, with installation completed in accordance with applicable accredited requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 18 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 18 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project Details

Project DetailInformation
Property TypeCommercial – Multi-storey
Installation AddressUnit 18 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel ManufacturerJA Solar Technology Co Ltd
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Compliance

The Unit 18 installation fulfilled applicable electrical safety, technical and accreditation requirements, supported by the required compliance documentation.
The grid-connected equipment met relevant Australian/New Zealand standards and technical requirements.
The system incorporated approved JA Solar modules and was installed in accordance with applicable accredited installation requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Unit 19 — Commercial Solar Installation Rossiter Constructions Shepparton

Unit 19 received a 5.00kW grid-connected solar system comprising 8 JA Solar 625W panels and a dedicated Fronius inverter. The installation was completed on 12 September 2026.

Project Details

Project DetailInformation
Property TypeCommercial – Multi-storey
Installation AddressUnit 19 / 16 Industrial Road, Shepparton VIC 3630
Installation Date12 September 2026
System TypeNew Solar PV System
Solar Capacity5.00 kW
Number of Panels8
Panel Capacity625 W each
InverterFronius Symo 10.0-3-M
ConnectionGrid-connected
Battery StorageNo
STCs34

Switchboard & Electrical Compliance

The Unit 19 installation met applicable electrical safety, technical and accreditation requirements, with supporting compliance documentation provided.
The grid-connected equipment complied with relevant Australian/New Zealand standards and technical requirements.
The system used approved JA Solar modules and was installed under the applicable accredited installation requirements.

95kW Commercial Solar Shepparton Victoria Rossiter Constructions Expands Across 19 More Units  Green Electric Solutions

Government Rebates Supporting in Expanding Solar Project in Rossiter Construction, Shepparton

The project documentation records 656 Small-scale Technology Certificates (STCs) at $38.00 per certificate, delivering a documented government rebate of $24,928.00 across the completed installations.

Victorian businesses completing commercial solar between 30kW and 200kW may also be eligible for the VEU Commercial Solar discount stacked on top of federal STCs — potentially reducing upfront costs significantly further. Green Electric Solutions is an officially listed VEU Commercial Solar provider in Victoria, meaning eligible Melbourne businesses can access both incentive streams through a single installer.

Government RebateCalculationRebate Value
Small-scale Technology Certificates (STCs)656 × $38.00$24,928.00
Total Government Rebates—$24,928.00
Important: Rebate figures are based on the supplied project documentation. Eligibility and certificate values may vary according to applicable program rules and project circumstances.

Green Electric Solutions — Your Best Local Commercial Solar Partner Across Melbourne

Green Electric Solutions combines local Victorian expertise, qualified professionals and recognised industry approvals to deliver compliant commercial solar solutions. Our team manages the project from system design and equipment selection through installation, electrical compliance, commissioning and applicable incentive documentation. This provides Melbourne businesses with a professionally managed solar solution backed by relevant industry credentials.

Approval / AccreditationWhat It Represents
CEC AccreditedDemonstrates recognised competency in solar PV system design and installation.
NET ApprovedApproved to participate in the relevant New Energy Tech installation framework.
Solar Victoria ApprovedApproved installer for eligible Victorian solar programs.
VEU Approved InstallerApproved to deliver eligible energy-efficiency upgrades under the Victorian Energy Upgrades program.
SAA-Certified ElectriciansQualified electrical professionals supporting compliant electrical installation work.
GoodWe Approved InstallerRecognised installer status for GoodWe energy products and systems.
AS/NZS ComplianceSystems are installed in accordance with applicable Australian and New Zealand standards.

As a local and highly qualified Victorian solar company, Green Electric Solutions understands the requirements of Melbourne commercial properties and Victorian energy programs. Our experienced team provides businesses with a streamlined service covering solar design, installation, electrical works, compliance, commissioning and available government incentive documentation.

Our Service Area — Within 80 km of Altona

Green Electric Solutions services commercial properties within an 80 km radius of Altona, covering Melbourne and surrounding suburbs including Point Cook, Werribee, Tarneit, Truganina, Hoppers Crossing, Melton, Caroline Springs, St Albans, Sunbury, Craigieburn and Mickleham. Our local team provides professional solar, electrical and energy solutions with direct access to qualified specialists.

Commercial Solar FAQs by Victorians

How much does a commercial solar system cost in Victoria?
Pricing depends on system size, site conditions, equipment, switchboard work, structural requirements and grid-connection requirements.

What rebates and incentives are available for commercial solar in Victoria?
Victorian businesses may be eligible for incentives including the VEU Commercial and Industrial Solar PV discount for eligible systems, while eligible systems may also qualify for federal STCs. Current VEU rules cover systems from 30 kW to 200 kW, with larger systems potentially addressed through project-based activities. Green Electric Solutions is a listed VEU Commercial Solar provider in Victoria.

How much can a business save with commercial solar?
Savings depend primarily on electricity consumption, tariff structure, system production and how much solar energy the business uses directly rather than exporting.

What size solar system does my business need?
The system should be sized around the business’s electricity consumption, operating hours, available roof space and desired level of grid independence. Daytime electricity usage is particularly important because solar generation occurs during daylight hours.

Can my commercial property export excess solar electricity to the grid?
Not necessarily. The local electricity distributor determines connection and export conditions. Export limits can affect how much surplus electricity a business can send to the grid.

Do I need grid-connection approval before installing commercial solar?
Grid connection generally requires approval from the relevant Distribution Network Service Provider (DNSP), with requirements varying according to system size and the proposed export arrangement.

Can solar be installed on a factory, warehouse, office or other commercial building?
Yes, commercial and other non-residential premises can be eligible for Victorian commercial solar incentives, subject to the applicable program requirements. The current VEU commercial and industrial activity includes businesses, factories, community buildings, schools and hospitals.

Can my commercial solar system include a battery?
Yes. A battery can store excess solar generated during the day for later use. Businesses considering future battery installation should discuss battery compatibility when selecting their solar system and inverter.

What approvals, standards and qualifications are required for commercial solar installation in Victoria?
Commercial solar installations must meet applicable electrical, product and installation requirements. For relevant Victorian programs, installer accreditation, electrical licensing and approved products are important compliance considerations.

How long does commercial solar installation take?
The timeframe depends on system size, engineering, roof and structural requirements, switchboard work, equipment availability and DNSP/grid-connection approval. Larger commercial projects can require more extensive design and approval work

Power Your Business. Future-Proof Your Energy

Contact Green Electric Solutions to explore a tailored commercial solar solution aligned with your business’s energy needs, savings goals and available rebates—simply by filling out the form below.

blog lead

1 thought on “95kW Commercial Solar Shepparton Victoria: Rossiter Constructions Expands Across 19 More Units | Green Electric Solutions”

Leave a Comment